Predmerice
Czech Republic - reconstruction of the original HPP from 1951.


Project review
Rehabilitation of the HPP Predmerice, carried out for our important client CEZ represents a specific technological reconstruction.
The rehabilitation included mainly replacement and overhauling of the HPP's obsolete equipment; such as turbine and generator overhaul, replacement of a cell type switchgear with new cubicle type, installation of new trash rack cleaning machines, and complete automation of the power plant.
Provided services
HYDROPOL was responsible for feasibility study, complete project documentation and design as well as legal framework and permissions. We also provided engineering, project management, and commissioning services of this plant.
Main data
Country: | Czech Republic |
Built (year): | 1951 |
Output (kW): | 1 × 2 600 |
Head (m): | 7.6 |
Capacity (m3/s) | 1 × 37 |
Completion (year): | 2009 |