Completed powerhouse
Country: Built (year): Output (kw):
CZ New 3 x 300
Head (m): Capacity (m3/s): Completation (year):
1.9 3 x 17 2011 - 2012
Completed powerhouse
Completed powerhouse
Machinery
Machinery
Installation of turbines
Installation of technology
Construction works
Construction works
HPP Velky Osek weir
HPP Velky Osek weir

Velky Osek

Project review

The construction of SHPP Velky Osek has been succesfully completed in October 2012.

The new SHPP Velky Osek is connected to the existing weir in Velky Osek on the river Elbe in the region Central Bohemia.

According to designed parameters this SHPP reaches the capacity of 900 kW with annual generation of 4 250 MWh of electric energy. Its three Kaplan turbines utilize discharge of more than 50 m3/s. SHPP Velky Osek is the only plant in the Czech Republic working under the head up to 2 meters.

Provided services

As general contrator Hydropol provided the site complex development, preparation of relevant studies, permitting, project design & engineering services and complete EPC delivery.