SHPP Svijany completed powerplant
Country: Built (year): Output (kw):
CZ New 200
Head (m): Capacity (m3/s): Completation (year):
1.7 - 2.4 12 2010 - 2012
SHPP Svijany completed powerplant
Construction site
Construction works
Construction works foundation sump
Construction works new powerhouse
Powerplant and the weir
Turbine and generator
Turbine transport

Svijany

Project review

The construction of SHPP Svijany has been succesfully completed in October 2012. The new SHPP is located in Svijany using the hydro potential of Jizera river in the North Bohemia (Liberec region) and is connected with existing weir and mill Perner.

The new SHPP was constructed at the present weir, this SHPP is bypassed with a fish pass (creek type). The rated power of this SHPP is 200 kW, 1 unit of horizontal Kaplan turbine with runner diameter 1.78 m is used. For power output a new power line was erected (length 200m).

Annual generation is 1100 MWh. This SHPP is designed as fully automated and remote-operated.

Provided services

Hydropol provided study, consultations, design & engineering and project management works.