Country: Built (year): Output (kw):
Italy 170
Head (m): Capacity (m3/s): Completation (year):
2.3 6.4 2006
Servola outlet channel
Servola outlet channel

Servola

Project review

Hydropol has elaborated the feasibility study of the thermoelectric plant in Servola (Trieste, Italy). This power plant is placed on the cooling water outlet from the thermal power plant Servola.

The objective of the study was initial design and feasibility decision on construction of a new micro hydro power plant. As the best option for the plant, one horizontal tubular Kaplan turbine was selected. The operation should be fully automated, unattended, and remote controlled.

Provided services

Hydropol provided feasibility study and design for this unusual hydropower plant.