HPP Predmerice
Country: Built (year): Output (kw):
CZ 1951 1 x 2 600
Head (m): Capacity (m3/s): Completation (year):
7.6 1 x 37 2009
HPP Predmerice
construction works
new trashrack cleaner
new generator with hydraulic governor

Predmerice

Project review

Rehabilitation of the HPP Predmerice, carried out for our important client CEZ OZE, part of the CEZ Corporation, represents a specific technological reconstruction.

The rehabilitation included mainly replacement and overhauling of the HPP's obsolete equipment; such as turbine and generator overhaul, replacement of a cell type switchgear with new cubicle type, installation of new trash rack cleaning machines, and complete automation of the power plant.

Provided services

Hydropol was responsible for feasibility study, complete project documentation and design as well as for legal framework and permissions.

Hydropol also provides engineering, project management, and commissioning services.