completed rehabilitated dam
Country: Built (year): Output (kw):
CZ
Head (m): Capacity (m3/s): Completation (year):
1999
completed rehabilitated dam
works in the left abutment
laying of the geomembrane insulation system
view of the upstream face before rehabilitation

Moravka

Project review

The Moravka dam with 39 m height and 25000 m2 upstream face surface area was the first dam built in the Czech Republic with the utilization of asphalt concrete upstream face insulation.

This layer was exposed to the 'first project' deficiencies and severe weather conditions with big range of surface temperatures, leading to its leakage. Together with 1997 flood damage caused to the dam it was the main reason for its rehabilitation.

The project covered major civil works modifi-cations, including new access and inspection galleries, and new upstream face isolation with synthetic geomembranes.

Provided services

Hydropol was a turnkey contractor for the upstream face geomembrane system, delivering the project within contracted schedule, quality, and budget.

The project reached 11th year of its successful operation under full satisfaction of the client.