201303061952387ft
Completed powerplant
Country: Built (year): Output (kw):
PL New 885
Head (m): Capacity (m3/s): Completation (year):
10.8 9.0 2011 - 2013
Completed powerplant
Construction works
Construction works powerhouse roof concreting and penstock
Construction works Powerhouse erection
Construction works Upper Floor concrete reinforcement
Generator
Intake and cleaning machine
Powerhouse and grading works

Borek Szlaschecki

Project review

The investor company Elektrownia Skawina s.a. ordered the complete realization of the new SHPP on the shipping channel Laczany-Skawina which has been already built up in 1955 - 1958 on the river Wisla in South Poland.

This project is characterized by very challenging structure of intake which has been built up inside te earth dam during the full operation with difference of 12 m water level.  Very stable hydrological conditions enable using hydropower potential very efficiently.

The total output of this SHPP is 885 kW.

Provided services

As general contrator Hydropol provides the site complex development, preparation of relevant studies, permitting, project design & engineering services and complete EPC delivery.