201209201329427bm
HPP Bakov nad Jizerou powerhouse and weir
Country: Built (year): Output (kw):
CZ 1922 2 x 200
Head (m): Capacity (m3/s): Completation (year):
2.65 2 x 10 2003 - 2004
HPP Bakov nad Jizerou powerhouse and weir
original machinery
original machinery

Bakov nad Jizerou

Project review

This power plant, built in 1920, utilizes low head on medium capacity river. It is a specific plant built during the river regulation period.

The plant has been exposed to a long period of operation without any significant modifications, thus became very obsolete. Low efficiency, combined with large number of staff necessary to its operation, led to poor financial results.

Provided services

Hydropol was responsible for feasibility studies of various options for rehabilitation/uprating/optimization, complete design works and specifi-cations, tendering and contracting, legal framework and permissions, construction management, project commissioning, and licensing.